ScheduleMATRIX
Developed by JMT

SAM_MATRIX

A Smarter Way to Evaluate Schedule Integrity

Score a P6 schedule against the DCMA 14 points, see which method fits the project, and read the result through Lean Six Sigma.

Checks14 + 13 extra

Step 1 · Project profile

Sets how far the 14 points apply

Assessment limits

Optional. Defaults are the DCMA 14-point thresholds
Change the limits to match your client or employer

Set your own limits, for example a maximum activity duration of 25 days instead of 44. The result is then labelled as a modified 14-point assessment everywhere, including the report. Zero-tolerance checks (leads, negative float, invalid dates) stay fixed.

Step 2 · Schedule file

Read in your browser, never uploaded
Your work

Ready to share the result?
Export the report

How the checks are read. Unless you change the limits under Assessment limits, thresholds follow the DCMA 14-point assessment (DCMA-EA PAM 200.1). Float and duration are converted to working days with each activity's calendar. Planned Finish stands in for the baseline finish, and the critical path test is a static trace of the zero-float chain, not a re-run of the schedule in P6. Use the result to screen, then confirm findings in the source schedule.