A Smarter Way to Evaluate Schedule Integrity

Score a P6 schedule against the DCMA 14 points, see which method fits the project, and read the result through Lean Six Sigma.

Checks14

Step 1 · Project profile

Sets how far the 14 points apply

Assessment limits

Optional. Defaults are the DCMA 14-point thresholds
Change the limits to match your client or employer

Set your own limits, for example a maximum activity duration of 25 days instead of 44. The result is then labelled as a modified 14-point assessment everywhere, including the report. Zero-tolerance checks (leads, negative float, invalid dates) stay fixed.

Step 2 · Schedule file

Read in your browser, never uploaded

Step 3 · Assessment

Step 4 · Lean Six Sigma analysis

Ready to share the result?
Export the report

How the checks are read. Unless you change the limits under Assessment limits, thresholds follow the DCMA 14-point assessment (DCMA-EA PAM 200.1). Float and duration are converted to working days with each activity's calendar. Planned Finish stands in for the baseline finish, and the critical path test is a static trace of the zero-float chain, not a re-run of the schedule in P6. Use the result to screen, then confirm findings in the source schedule.