ScheduleMATRIX
Developed by JMT

SAM_MATRIX

A Smarter Way to Evaluate Schedule Integrity

Score a P6 schedule against the DCMA 14 points and see which method fits the project.

Checks14

Step 1 · Project profile

Sets how far the 14 points apply

Step 2 · Schedule file

Read in your browser, never uploaded

Step 3 · Assessment

Ready to share the result?
Export the report

How the checks are read. Thresholds follow the DCMA 14-point assessment (DCMA-EA PAM 200.1). Float and duration are converted to working days with each activity's calendar. Planned Finish stands in for the baseline finish, and the critical path test is a static trace of the zero-float chain, not a re-run of the schedule in P6. Use the result to screen, then confirm findings in the source schedule.